Sourcing guide

How to Source Clothing from Bangladesh

Sourcing clothing from Bangladesh takes six stages: send a tech pack to a supplier, receive a quotation, approve a physical sample, place the bulk order, monitor quality during production, and inspect before shipment. From first enquiry to goods on the water is typically 90–120 days for a first order, and 60–80 days for repeat orders once your patterns and fits are established.

Below is each stage in detail, including what you need to prepare, what can go wrong, and what it costs.

STEP 01

Prepare Your Tech Pack

Assemble a flat sketch, measurement chart, fabric spec, trims and colourways — or send a reference garment instead.

STEP 02

Get a Quotation

Ask for FOB pricing broken down into fabric, trim, CM and margin. We quote within 48 hours.

STEP 03

Approve a Sample

Two or three rounds: development, fit, then the pre-production sample the bulk is judged against.

STEP 04

Place the Order and Agree Terms

Settle price, delivery date, Incoterm and payment terms in writing before production starts.

STEP 05

Quality Control During Production

Pre-production meeting, inline at 20%, midline at 50–60%, and final inspection to AQL 2.5.

STEP 06

Inspection, Shipment and Documents

Packing, booking, and the full export documentation set. Sea freight runs 20–30 days.

Step 1

Prepare Your Tech Pack

A tech pack is the specification document a factory works from. Without one, any quote you receive is a guess.

At minimum it should contain:

  • A flat sketch of the garment
  • Measurement chart with tolerances
  • Fabric composition and weight (GSM)
  • Trim and accessory details
  • Colourways with Pantone references
  • Label and packaging instructions

If you do not have a tech pack, send a physical reference sample instead. We can reverse-engineer a spec from a garment you already own, which is often faster and more accurate for a first order.

See which factories we would match it to

Step 2

Get a Quotation

Ask for FOB pricing, and ask for it broken down. A quote that is a single number tells you nothing about whether the price is fair or whether it will hold.

A proper breakdown separates fabric cost, trim cost, CM (cut and make) charge, and margin.

Give the supplier three things when you ask: the quantity, the target price you have in mind, and your delivery deadline. Buyers often withhold the target price believing it weakens their position. It does the opposite — it lets the supplier tell you immediately whether it is achievable, instead of quoting high and negotiating for three weeks.

We quote within 48 hours of receiving a tech pack. Send yours.

Step 3

Approve a Sample

Never place a bulk order from a photograph. The sampling stage exists to catch fit, fabric hand-feel and construction problems while they cost nothing to fix.

Expect two or three sample rounds:

  • Development sampleConfirms the pattern.
  • Fit sampleConfirms grading across sizes.
  • Pre-production sampleThe one you approve, and against which the bulk is judged.

Sampling takes 10–14 days per round, plus 3–5 days international courier.

Sample charges are normal and usually refunded against the bulk order. A supplier offering free samples with no order commitment is either subsidising them from the bulk price or not making them properly.

Step 4

Place the Order and Agree Terms

Settle four things in writing before production starts: the final FOB price, the delivery date, the Incoterm, and the payment terms.

For Bangladesh, the standard payment structure is either an irrevocable letter of credit at sight, or a telegraphic transfer with 30% deposit and 70% against shipping documents. First-time buyers are usually offered TT; LC becomes practical once order values justify the bank charges.

FOB is the normal Incoterm here, meaning the price covers goods loaded onto the vessel at Chittagong. Freight, insurance and import duty at your end are yours.

Step 5

Quality Control During Production

This is the stage most first-time importers skip, and it is the stage that determines whether the shipment is usable.

Final inspection alone is too late — by the time goods are finished, a fabric or fit problem affects the entire order.

CHECK 01

Pre-production meeting

Confirm the approved sample, fabric and trims with the factory before cutting.

CHECK 02

Inline inspection at 20% completion

Catches construction faults while only a fraction of the order is affected.

CHECK 03

Midline inspection at 50–60%

Confirms measurement consistency across the run.

CHECK 04

Final random inspection to AQL 2.5

Statistical sampling of the finished, packed order.

We run all four stages as standard and send photographic reports at each one.

Step 6

Inspection, Shipment and Documents

After final inspection passes, goods are packed, the shipment is booked, and export documentation is prepared.

  • Commercial invoice
  • Packing list
  • Bill of lading
  • Certificate of origin
  • Any buyer-specific compliance certificates

Sea freight to the US East Coast or Northern Europe runs 20–30 days from Chittagong. Air freight is 5–7 days at roughly 8–10× the cost, and is normally used only to recover a missed deadline.

Container vessel loaded with export cargo departing port

Indicative pricing

What It Costs

Indicative FOB ranges for our main woven categories at 1,000 pieces.

Category
FOB range
At quantity
Typical lead time
Basic woven shirt
FOB range$4.80 – $7.20
At quantity1,000 pcs
Lead time45–55 days
Chino trouser
FOB range$6.50 – $9.80
At quantity1,000 pcs
Lead time50–60 days
Denim jeans
FOB range$7.90 – $12.50
At quantity1,000 pcs
Lead time60–75 days
Padded jacket
FOB range$14.00 – $24.00
At quantity1,000 pcs
Lead time60–75 days

Prices vary with fabric, quantity and finish — these are indicative ranges, not quotations.

Learn from other buyers

Common Mistakes to Avoid

Five errors that account for most failed first orders out of Bangladesh.

  • Ordering bulk without an approved pre-production sample
  • Choosing a supplier on price alone without checking audit status
  • Leaving quality control until final inspection
  • Not confirming fabric availability before agreeing a delivery date
  • Assuming the quoted lead time includes shipping — it does not

Frequently asked questions

Frequently Asked Questions

A first order typically takes 90–120 days end to end: 10–14 days sampling per round, 45–60 days production, and 20–30 days sea freight. Repeat orders run 60–80 days because sampling is shorter.

Not necessarily. A physical reference sample works, and so does a detailed sketch with measurements. But a quote given without either is an estimate, and it will change once real specifications arrive.

Either an irrevocable letter of credit at sight, or telegraphic transfer with a 30% advance and 70% against shipping documents. First-time buyers are generally offered TT terms.

Yes, and we arrange it for buyers travelling to Dhaka. If you cannot travel, we provide video walkthroughs and photographic audit reports of the production unit.

Our MOQ starts at 1,000 pieces per style per colour, with some styles available at 500.

Start at step one.

Send your tech pack or reference sample, and we will quote within 48 hours.

WhatsApp